|
| Civil & Structural |
 |
|
| .................................................................................................................................................... |
Ananth offers Civil engineering services involving the design of physical and naturally built environment. The department is responsible for basic, pre-bid and detail engineering of various types of structures and foundation.
Ananth Structural engineers are involved in the design of buildings and large non-building structures, medical equipment, machinery, vehicles, items where structural integrity affects the item's function or safety. Structural engineers make designs that accommodate the given design criteria, predicated on safety or serviceability, and performance.
The department capabilities include:
|
 |
Study and design of foundation systems, open, pile, and raft |
 |
Design analysis of steel structures as pipe racks and technological structure |
 |
Machine foundation design |
 |
Design analysis of concrete structures |
 |
Site co-ordination support |
 |
Preparation of material take off |
 |
Site analysis and review of geo-technical report |
 |
3D dimensional modeling, preparation of basic and detailed CAD drawings |
 |
Connection design and fabrication drawings |
 |
Tank foundation design |
|
To detail the tilt up wall panels and prepare the embed books for the project. The steps involved in the Tilt Up Walls Project are,
|
 |
Generate wall elevations. Separate into individual panels. |
 |
Put panels into paper space templates and Dimension |
 |
Add openings and other architectural features to plans. |
 |
Quality Assurance Process |
 |
Make an embed list. |
 |
Base camp management |
|
 |
Panel to Pier/Footing Connection |
 |
Panel to panel |
 |
Multi-floor connections |
 |
Roof connections |
 |
Canopy connections |
|
Depending on the structure and layout of various load-bearing members, the following items and required accessories will be incorporated to give a total safe support system for scaffolding and form works.In addition systems availability on project site for a particular project will also be considered while planning the layout.
|
 |
Aluma Sure Lock System (easy erection, dismantling and handling – saving in labour cost) |
 |
Aluma panelized deck (simple assembly package and less production time – saving in time and labour cost) |
 |
Hi-load shoring system (for support of heavy slab and for flat slab. |
 |
Ganged wall from system (for retaining walls with not much constraint on height. |
|
| |